Sustainable Site Planning
-
The library site at Santa Monica Blvd. and Sixth
Street was reused and redeveloped.
-
The Main
Library is served by several Big Blue Bus lines
and has bike parking. Use of alternative
methods of transportation reduces pollution and
land development impacts from automobile use.
-
An approved
erosion control plan was implemented during
construction.
-
Underground parking
eliminates large, paved surfaces exposed to
sunlight.
-
The building's Energy
Star™ roof is treated to reflect sunlight. These
design elements reduce "heat islands," which
contribute to higher summer temperatures and
smog. The roof also reduces heat
gain in the building that improves energy
efficiency.
-
Electric car
charging stations are planned for the parking
structure.
|
|
This page was last modified on
06/26/2008 |
|